Ford Sierra

1982-1993 of release

Repair and car operation



Ford Siyerra
+ 1.2. Car identification
+ 2. Maintenance
+ 3. General data
- 4. Engines
   - 4.1. Petrol engines
      + 4.1.1. Technical characteristics
      4.1.2. Adjustment of gaps of valves
      + 4.1.3. Ignition system
      + 4.1.4. Fuel system
      + 4.1.5. The repair which is not demanding removal of the engine
      4.1.6. Removal and engine installation
      4.1.7. Engine dismantling
      4.1.8. Identification of cooperating parts
      4.1.9. Engine assembly
      4.1.10. Replacement of pistons
      4.1.11. Removal and installation of an intermediate shaft
      4.1.12. Gazoraspredeleniye system
      4.1.13. Greasing system
      - 4.1.14. Cooling system
         4.1.14.1. Plums of liquid and filling of system of cooling
         4.1.14.2. Removal and radiator installation
         4.1.14.3. Removal and fan installation
         4.1.14.4. Pump of okhladzhayushchy liquid
         4.1.14.5. Thermostat replacement
      4.1.15. Suspension bracket of the power unit
      4.1.16. System of production of the fulfilled gases
   + 4.2. Diesel engine
+ 5. Coupling
+ 6. Transmissions
+ 7. Driveshaft and back bridge
+ 8. Steering
+ 9. Suspension brackets
+ 10. Brake system
+ 11. Body
+ 12. Electric equipment






4.1.14.4. The pump of cooling liquid

GENERAL INFORMATION

Bolts of fastening of the pump


Removal

PERFORMANCE ORDER
1. To disconnect from the accumulator a wire of weight and to merge liquid from cooling system.
2. To remove a radiator and the fan.
3. To disconnect from the pump of cooling liquid the elastic pipeline conducting to a heater.
4. To remove a casing of a gear belt.
5. To remove the elastic pipeline of cooling liquid between the pump of a cooling zhtdkost and a radiator.
6. To unscrew 3 bolts of fastening of the pump of cooling liquid and completely to take the pump.

Repair

PERFORMANCE ORDER
1. To remove by means of a press a pulley of a drive of the pump.
2. To take from the pump case knot of a shaft of the pump with consolidation, the precision bearing and a rotor.
3. To remove a sealant from a shaft of the pump and to take the precision bearing from the pump case.
4. By means of a ring and a shaft of the corresponding diameter and length to move a nave of a pulley of the pump on a pump shaft so that the end of a shaft acted on 1,5 mm over an external surface of a nave.
5. To establish a new sealant on a shaft of the pump and in deepening in the case.
6. To establish on a pump shaft its rotor so that the gap between its blades and the case of the pump made 0,8 mm.

Installation

PERFORMANCE ORDER
1. To clear surfaces of connection of the case of the pump and the block of cylinders of the engine.
2. To establish the pump together with new laying on the block of cylinders.
3. To establish a casing of a gear belt.
4. To connect to the pump of cooling liquid the elastic pipelines connecting the pump to a radiator and a heater.
5. To establish a radiator and the fan.
6. To adjust a tension of a maple belt (1 – a bolt of the tension device, And – a belt deflection (And = 10 mm)).
7. To fill cooling system, to connect the accumulator and to check tightness and functioning of system of cooling. In case of need to add level of cooling liquid.