| 1. To screw up a stopper plum in the block of cylinders and to connect the bottom elastic pipeline to a radiator. |
| 2. To fill cooling system through a jellied opening of a broad tank with recommended amount of cooling liquid. |
| 3. To connect the accumulator. |
| 4. To start the engine and let's to it work with number of turns of the accelerated idling before opening of the valve of the thermostat. |
| 5. To switch off the engine and to check tightness of connections of system of cooling. |
| 6. After cooling of the engine to check and in case of need to add level of cooling liquid. |