Ford Sierra

1982-1993 of release

Repair and car operation



Ford Siyerra
+ 1.2. Car identification
+ 2. Maintenance
+ 3. General data
+ 4. Engines
+ 5. Coupling
+ 6. Transmissions
+ 7. Driveshaft and back bridge
+ 8. Steering
+ 9. Suspension brackets
+ 10. Brake system
+ 11. Body
- 12. Electric equipment
   12.1. Technical characteristics
   12.2. Relay and safety locks
   12.3. Removal and generator installation
   12.4. Dismantling and generator assembly
   12.5. Adjustment of a tension of a maple belt
   12.6. Starter
   12.7. Windscreen screen wiper, knot of indexes and headlight
   12.8. Removal and installation of a combination of devices
   12.9. Adjustment of light of headlights
   - 12.10. Heating and ventilation system
      12.10.1. Removal and heater installation
      12.10.2. Fan engine
   + 12.11. Electroschemes






12.10. Heating and ventilation system

12.10.1. Removal and heater installation

GENERAL INFORMATION

System of heating and car ventilation

1–heater,

2–case of a heater,

3–air zaslonka,

4–knot of management,

5–case of the fan,

6–fans

Heater case

1–nut of fastening,

2–heater,

3–bells of supply of air

Removal

PERFORMANCE ORDER
1. To disconnect a weight wire from the accumulator.
2. In a compartment of the engine to establish spring clips on the elastic pipelines of cooling liquid connected to a heater.
3. To disconnect a cover and consolidations of air pipelines.
4. To remove the average console of the forward panel together with a ware box (fastening by six bolts).
5. To remove control lever brackets heating on the forward panel and to unscrew the control lever case (three screws), to move it down and to disconnect electric wires.
6. To disconnect from heating knot air bells.
7. To disconnect on the left side two cables of management of supply of air.
8. To unscrew nuts of fastening of knot of heating and to take it.

Installation

PERFORMANCE ORDER
For installation of knot of heating it is necessary to execute actions in return sequence in relation to removal process. Before installation of facing of a floor it is necessary to adjust a cable of management of supply of air. After installation of a heater it is necessary to remove air from system of cooling of the engine and to fill amount of cooling liquid to necessary level.